- What do you need to give a quote?
- The contract drawings (structural, and architectural where steel shows up), the specs if you have them, and your bid date.
- How fast can you start?
- Right after we receive the purchase order. Detailing usually takes two to four weeks depending on the size of the job and how complete the drawings are.
- Do you work outside Texas?
- Yes. Most of our work is in Texas, and we work with fabricators anywhere in the U.S.
- Can you provide stamped drawings?
- Yes. When a job requires a seal, we deliver the drawings sealed by a Texas-licensed professional engineer and include it in the quote.
- Can we talk in Spanish?
- Yes. Our office works in English and Spanish.